Asbestos floor tile and mastic removal in Round Rock

Typical cost in Round Rock

  • One bathroom or laundry floor, up to about 100 sq ft$900 – $2,500+
  • Kitchen floor, about 200–300 sq ft$1,500 – $4,000+
  • Several rooms of flooring, about 1,000 sq ft$4,000 – $10,000+

A new floor in an old kitchen or laundry room starts with the old tile and glue coming up. We remove asbestos floor tile and mastic in Round Rock homes, sampling the tile, the black glue and any sheet-flooring backing first, so you know what we lift and what's left for your flooring crew.

Houses in Hutto and Taylor get the same floor service. Call with the address and which rooms are changing, and we'll set up a visit to sample the tile and glue.

Tell us about your project
Nine-inch vinyl floor tiles and black mastic partly exposed in an older kitchen

Common asbestos floor tile and mastic jobs

Resilient floor tiles

Two floors can share a size, color and pattern and still test differently, so each one gets its own sample. We'll ask which rooms you're changing and whether a newer floor was ever laid over the old one or patched. From the results, we list the floors that tested positive and what stays underneath.

Adhesive and black mastic

The glue under a tile is tested as its own material. If only the tile comes up, the black mastic stays behind for the next trade to deal with. Before your flooring installer starts preparing the surface, we make clear whether the glue is part of our work and what condition we leave the slab or subfloor in.

Sheet flooring and backing

Cabinets, a wall built later or a newer floor laid on top can hide part of an old sheet floor, so point out whatever covers it. The backing under sheet flooring can be a different material from the surface, and we test both. The area we cover follows your project, including spots that only show once things come apart, rather than stopping at the nearest visible edge.

Layered floors and transitions

Doorways, additions and remodeled kitchens can hold several floors stacked up. Room by room, we mark where the materials change, check whether the old floor runs under the cabinets and note how the finished levels will meet, so an untested layer doesn't surprise anyone once demolition starts.

How we leave the floor

Don't grind or sand suspect glue before it's tested. A cleared floor isn't automatically flat, dry or ready for new flooring. With you and your flooring installer, we go over what counts as done. The asbestos work is ours; for subfloor repairs, leveling and moisture checks, we name who does each before we start.

Match Texas requirements to the building and project

A kitchen floor in a private home and the same floor in a public building or other facility fall under different Texas DSHS rules. Tell us how the building is used and the whole job, and we'll say which survey and notice rules apply. One house's rules may not fit a bigger building.

If the ceiling is coming down too, see popcorn ceiling removal. The rest of our home asbestos work is on the main page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (737) 241-3873